Plant for applying the background stripes on the pipes

30.07.2019
Plant for applying the background stripes on the pipes Specialists of Techvagonmash performed commissioning of the plant for applying the background stripes on the pipes and put it into industrial operation.
This unit is integrated into a fully automated weighing line, length measuring, marking and stamping of pipes (this line was supplied by RPE Techvagonmash for Interpipe NikoTube).
Back to the news