Design and construction of workshops and production complexes for surface preparation and painting

Techvagonmash offers a full cycle of engineering, including project and design works, manufacturing of equipment, equipping of enterprises and implementation of projects with appropriate certification.

We specialise in advanced technological solutions for various industries, drawing on many years of experience in the design and manufacture of equipment for surface preparation, shot blasting, painting, drying, and washing. We also offer comprehensive installation, commissioning and maintenance services.

Our company uses advanced innovations that guarantee high performance, reliability, energy efficiency, safety and environmental friendliness.

  • Wheelset painting line
    Wheelset painting line
  • Railway wheel painting line
    Railway wheel painting line
  • Wheel painting line. Interactive line control panel.
    Wheel painting line. Interactive line control panel.
  • Shot blasting chamber
    Shot blasting chamber
  • Painting and drying chamber for wagons
    Painting and drying chamber for wagons
  • Painting complex for painting trailed and mounted equipment of commercial vehicles
    Painting complex for painting trailed and mounted equipment of commercial vehicles
  • Washing-painting-drying chamber
    Washing-painting-drying chamber
  • Line for shot blasting and preservation of rolled metal sheets with conductive soil
    Line for shot blasting and preservation of rolled metal sheets with conductive soil
  


Research-and-production enterprise "Techvagonmash" performs the development of the following sections of the technical project of creation (reconstruction) of painting production facilities: 

- calculation of production capacity of paint production;

- technology development (calculation of surface preparation materials, paint materials, heat and energy resources, emissions);

- calculation of the required amount of equipment and design of equipment for surface preparation, painting and drying;

- calculation and design of the transport system;

- calculation and design of wastewater treatment equipment;

- calculation of the ventilation system;

- design of the paint preparation area;

- selection of painting machines;

- development of construction assignments, energy supply assignments, ventilation assignments for a specialised design organisation.